Books at a building company close late because the documents that carry the month's costs are still in trucks, glove boxes and inboxes when the month ends. Time cards, delivery tickets, sub invoices and change orders reach the office days or weeks after the 31st, so the first half of the next month goes to chasing paper instead of reconciling. The fix is not a faster bookkeeper. It is a written cutoff rule for each document and a weekly collection routine, so that on the last day of the month the office is holding a finished month and only has to close it.

Most advice on month end close construction starts at the bank reconciliation. That step is almost never the bottleneck. The bottleneck is upstream, in the field, and it is a habit problem before it is an accounting problem.

The close is waiting on four documents

Every one of these is created in the field by people whose job is building, not paperwork. Each has its own way of arriving late.

  • Time — crew hours written up from memory on Friday or the following Monday. Hours with no cost code get dumped into general labor, and the job cost report stops meaning anything. Coding hours at the point of entry is the subject of our piece on time tracking by cost code.
  • Delivery tickets — signed by whoever is on site, then left on a dashboard. The supplier invoice shows up weeks later, often covering several tickets, and without the ticket the office cannot confirm what landed or on which job.
  • Sub invoices — subs bill on their own calendar. Some bill on the 25th, some on the 10th of the next month, some when they remember. Many arrive without the lien waiver needed to pay them.
  • Change orders — approved verbally on site, built the same week and written up later or never. The cost is in the month. The revenue is not.

None of these is solved in QuickBooks. Each is a field habit showing up in the ledger a month late.

A late close is a wrong close

An office facing missing paperwork has two bad options. The first is to close on time without it. The job looks under budget this month because the costs are missing, then over budget next month when they land. Every job measured on cost-to-cost percent complete gets the wrong percentage, which means the wrong revenue, which means the wrong overbilling and underbilling. A WIP report built on an incomplete month is a confident report about the wrong numbers — and it is the report a bank or surety reads.

The second option is to hold the close open until everything arrives. The month gets locked around the 20th. Owner billing goes out late, cash comes in late, and every decision about a job is made on numbers three weeks old. Meanwhile the next month's paperwork is already piling up behind it.

The way out of both is to change when the documents arrive, not how fast the office processes them.

Set a cutoff rule for each document

A cutoff rule answers two questions: which month a cost belongs to, and the date by which the document must reach the office. Write both down. Without a written rule, every PM and every sub makes their own call, and the office inherits the result.

  • Time — belongs to the day worked. Submitted daily, coded to a cost code at entry. For month end, every hour through the last calendar day is in by 9 a.m. on the first business day. Uncoded hours go back to the foreman, not into overhead.
  • Delivery tickets — belong to the month the material landed on site, whatever the invoice date says. A photo of the signed ticket reaches the office the same day. The office keeps a running list of tickets with no matching invoice.
  • Sub invoices — pick one billing date and publish it. Some builders use the 25th with work projected to month end; others use the last day with a three-business-day window. An invoice that misses the window rolls to the next cycle and is paid a cycle later. No waiver, no payment.
  • Change orders — belong to the month the work was performed. No changed work starts without a written change order, or at minimum a logged directive with scope and a rough price. Entered within two business days of the directive.

The enforcement matters more than the dates. A sub whose late invoice gets paid on schedule anyway has no reason to change. A sub whose late invoice waits a full cycle usually changes after one. The same holds for crews: if uncoded hours land in overhead, nobody codes them. If they come back for correction before payroll, the habit fixes itself within a few weeks.

Work built on a verbal approval puts cost on the job this month with no revenue against it. If the paperwork is never written, the work is never billed — and by the time anyone notices, the owner remembers the conversation differently. Before every close, each PM lists every field directive that is not yet a signed change order. Each one is either priced and sent to the owner that week or recorded as a known cost on the job with a note. Nothing stays only in someone's memory.

Collect weekly so the last week is the only week

A month end is a week end with more riding on it. If the office collects every Friday, then on the last day of the month only the final partial week is outstanding. This is the part of month end close construction that no accounting checklist covers, and it is where the close is actually won. A weekly routine looks like this:

  1. Time for the week is submitted by foremen and approved by cost code. PMs approve Monday morning at the latest.
  2. Delivery ticket photos are matched to open orders and invoices. The unmatched list goes to each PM.
  3. Sub invoices received that week are checked against the schedule of values and the week's daily logs. If the log shows no crew on site, the invoice gets a question before it gets approved.
  4. Field directives and pending change orders are reviewed. Anything older than two business days without paperwork gets written up.
  5. Daily logs are checked for gaps. A missing day is a missing record of who was on site, what was delivered and what changed.

Done weekly, each step is small because there is only a week of material. Done monthly, the same steps are a pile, and the pile is the reason the close slips.

Accrue what still does not arrive

Some documents will be late no matter how good the rules are. A supplier that sends one monthly statement. A sub that bills quarterly. An equipment rental invoice that lags. Closing a month does not require every invoice. It requires every known cost to be recorded. For anything missing, book an estimate as an accrual and reverse it next month when the real invoice posts.

An accrual needs a defensible number. The best source is committed cost — the price already agreed. That is the whole case for purchase orders that show cost before the invoice exists. In BuilderSolve, purchase orders are in development and not shipped yet; today the commitment comes from the subcontract value and the line-item budget in the estimate. A delivered ticket with no invoice gets accrued at the quoted price. Sub work that the daily log shows was performed, with no invoice yet, gets accrued against that line of the schedule of values.

A five-day close, in order

Once the month arrives finished, the close itself becomes a short sequence. The exact days matter less than the order: field data first, accounting second.

  1. Last business day — final weekly collection. Each PM submits a list of open directives and any sub billing still expected.
  2. Day 1 — time locked. Payroll posted by cost code.
  3. Day 2 — sub and supplier invoices entered. Unmatched delivery tickets and known missing invoices accrued.
  4. Day 3 — change orders reconciled. Approved ones billed to the owner; pending ones recorded as cost with notes.
  5. Day 4 — bank and card reconciliations. Each PM reviews budget vs. actual on their jobs and flags anything that looks wrong.
  6. Day 5 — WIP report prepared, owner billings reviewed, month locked.

Where BuilderSolve fits, and where it does not

The software puts the field record and the job in one place. Daily logs, time entries by cost code and change orders with an audit trail all sit on the same job as the estimate and its budget, so budget vs. actual reflects what the field recorded. The AI assistant drafts daily logs, change orders and time entries from what the crew sends in; a person approves or rejects each draft before it counts. The platform reads QuickBooks one way. QuickBooks stays the book of record, and the close happens there.

The services side runs the routine itself. The finance team handles AR/AP, change orders and QuickBooks entries. The operations and admin team runs the Friday collection — chasing sub invoices, matching tickets and writing up directives. It is priced against the roles it replaces, at roughly 60% less than hiring them.

What neither does is make a foreman submit hours on time. Making submission easy does not make it mandatory. The cutoff rules and the consequences for missing them are the builder's decision, and they have to come from the owner of the company. We would rather say that plainly than promise software fixes a habit.

What to do before this month ends

  1. Write the four cutoff rules on one page — time, delivery tickets, sub invoices, change orders — each with the month a cost belongs to and the deadline.
  2. Send the sub invoice rule to every active sub with an effective date one billing cycle out, so the first late invoice is a known consequence and not a surprise.
  3. Start the Friday collection this week, even if it covers only time and delivery tickets at first.
  4. On the last business day of this month, ask every PM for the list of open directives. Price them or record them before the books close.

Common questions

how long should month end close take for a construction company

There is no fixed standard, but five business days is a workable target for a builder running 5-40 jobs once field documents arrive on a cutoff. The close itself is short. What stretches it to two or three weeks is waiting on time cards, delivery tickets, sub invoices and change orders that should have reached the office before the month ended.

what is a cutoff date for subcontractor invoices

It is the published date by which a sub's invoice must reach the office to be paid in that cycle. Common choices are the 25th with work projected to month end, or the last day with a short window after it. An invoice that misses the date rolls to the next cycle. Without that consequence, the date is a suggestion.

can you close the books without all invoices in

Yes, and you should. Closing requires every known cost to be recorded, not every invoice to be received. Missing costs are accrued — booked as an estimate based on committed cost, such as a subcontract value or quoted material price — and reversed the following month when the real invoice posts. Holding the month open for stragglers is what pushes the close to the 20th.

why is my construction WIP report wrong every month

Usually because the month closed without all its costs. Missing time, sub invoices or delivered material makes jobs look under budget one month and over budget the next, which throws off cost-to-cost percent complete and the overbilling and underbilling figures. Fixing the WIP report starts with cutoff rules for field documents, not with the report formula.

does BuilderSolve replace QuickBooks for month end close

No. BuilderSolve reads QuickBooks one way, and QuickBooks remains the book of record where the close happens. The platform keeps daily logs, time entries by cost code, change orders and budget vs. actual on each job. The finance services team can handle AR/AP and QuickBooks entries as part of the close.