Estimating & bidding
Everything we have written on estimating & bidding — the process, the paperwork and what it costs when it goes wrong.
-
Why ROM Estimates Anchor Clients to the Lowest Number
When you give an owner a budget range before drawings exist, they only remember the lower number.
-
Construction Escalation Clauses Need an Index
Tying price adjustments to supplier receipts sparks billing disputes; pegging them to published commodity indexes proves the market moved without exposing your purchasing.
-
Owner-Supplied Materials: Your Risk, None of Your Markup
The client saves the material margin, the builder keeps the late vanity and the cracked tub, unless the contract and the estimate say otherwise.
-
Construction Labor Rates for Estimating Come From Your Jobs
Divide coded hours by installed quantity on your last few jobs and you have a labor rate that describes your crew, not an average one.
-
Construction Estimate Exclusions Get Read in the Dispute
The exclusions that win an argument name the trench, the panel and the drawing sheet, not “unforeseen conditions” copied from the last ten bids.
-
Bid No-Bid Decision: Skip Jobs You Can't Staff or Price
Losing a bid costs a few estimating hours; winning a job with no superintendent costs margin on every job it borrows people from.
-
General Conditions Are Priced by the Week, Not a Percent
Site costs scale with weeks on site, so pricing them off hard cost quietly fills your backlog with the jobs that lose money.
-
Contingency in an Estimate Gets Cut Unless It Names Risks
Why a percentage loses at the bid table and how pricing named risks like subgrade, lead times and rot keeps the money in the job.
-
Construction Overhead Rate Belongs to Your Company
A borrowed overhead percentage overprices big jobs and quietly loses money on small ones, so build the rate from your own books.
-
Unit Price vs Lump Sum: Pick the Contract by the Risk
Contract form decides who pays when the quantity is wrong, so sort the job's unknowns before picking one.
-
Construction Cost Codes: Design Them for the Coder
Most cost code lists are built for the accountant and then abandoned by the person who has to code the invoices, so build yours for that person instead.
-
Construction Takeoff Process: Scope Hides Between Sheets
Missed scope rarely lives on one sheet—it lives where drawings, specs and the estimator's unspoken guesses fail to meet.
-
Bid Leveling: The Low Quote Has the Most Exclusions
A working method for turning three sub quotes that cover different scopes into three numbers you can actually choose between.
-
Markup vs Margin in Construction: 20% Isn't 20%
Markup and margin divide the same dollars by different numbers, and the difference comes out of net profit on every job.
-
Construction Estimate vs Quote vs Bid: Who Pays Overruns
Crews swap the three words freely on site, but in a dispute the document you handed over decides who absorbs the overrun.