Running the job,
written down
Practical writing for builders on estimating, scheduling, change orders, job costing and the back office that holds it together.
-
Construction Warranty Callbacks Need a Cost Code
Warranty work eats margin when it has no budget line, no tracking and no written line between defect and maintenance — here is how to fix all three.
-
Pay-When-Paid vs Pay-If-Paid: One Word Moves the Risk
The gap between 'when' and 'if' decides who absorbs an owner's default, so read both sides of every subcontract before it goes out.
-
Construction Quality Control Happens Before Cover-Up
Defects found after drywall or concrete cost a tear-out, so the check has to sit in the schedule before the covering trade arrives.
-
Near Miss Reporting in Construction Has to Cost Nothing
Crews tell you about the close calls only when telling you is fast and safe, and every long form or disciplinary follow-up teaches them to stop.
-
Long-Lead Items in Construction Set the Schedule First
The date a long-lead item really starts is usually the day the client picks it, and that date belongs in the first meeting.
-
Construction Labor Rates for Estimating Come From Your Jobs
Divide coded hours by installed quantity on your last few jobs and you have a labor rate that describes your crew, not an average one.
-
Update the Construction Schedule Weekly or It's a Drawing
A weekly update from field actuals, with a written cause for every slipped date, is what turns a schedule into a delay record.
-
Construction Estimate Exclusions Get Read in the Dispute
The exclusions that win an argument name the trench, the panel and the drawing sheet, not “unforeseen conditions” copied from the last ten bids.
-
Construction Draw Inspection Pays for What's Installed
Why the inspector's walk-through rewards finished stages over busy sites, and how to schedule backward from the draw date.
-
Set Construction Selections Deadlines by Order Date
Selection due dates come from the supplier's lead time and the install date — sign them into the contract and a late pick stops being the builder's delay.
-
Change Order Time Extension: State the Days, Even Zero
A price-only change order keeps the old finish date — and leaves the builder paying for days the owner's changes used up.
-
Construction Deposit: Size It to Month One, Not a Percent
A percentage deposit is a guess, while a deposit built from the schedule's first billing window is a number you can defend line by line.
-
Bid No-Bid Decision: Skip Jobs You Can't Staff or Price
Losing a bid costs a few estimating hours; winning a job with no superintendent costs margin on every job it borrows people from.
-
General Conditions Are Priced by the Week, Not a Percent
Site costs scale with weeks on site, so pricing them off hard cost quietly fills your backlog with the jobs that lose money.
-
Freeze the Baseline Schedule or Lose the Delay Argument
A baseline that gets saved over every time dates move stops being evidence of anything, so keep one plan fixed and one plan live.
-
Float in a Construction Schedule Belongs to Whoever Slips
Float disappears without moving the finish date, so the only proof of who spent it is a note written at the update where it shrank.
-
Differing Site Conditions: Give Notice Before You Dig
The change order for unexpected rock or rot is decided in the first hours on site, long before anyone prices it.
-
Contingency in an Estimate Gets Cut Unless It Names Risks
Why a percentage loses at the bid table and how pricing named risks like subgrade, lead times and rot keeps the money in the job.
-
Hire a Construction Project Coordinator Before a Second PM
Write out every task your PM does, cross off the ones that need a PM, and what is left is usually a coordinator's full-time job.
-
A Construction Daily Report Records What Didn't Happen
Work completed is the easy half of a daily log — the half that matters later is the trade that didn't come and the wall that sat waiting on an answer.
-
Client Not Paying Contractor? The Contract Sets the Order
Why a stop-work that skips a contract step can hand the breach to you, and why the lien deadline runs on its own clock from day one.
-
Construction Time Tracking Done on Friday Is Fiction
Why weekly timesheets get payroll right and job costing wrong, and the small changes that make daily coding the easier habit for a foreman.
-
Signing a Delivery Ticket Uncounted Accepts the Shortage
The signature on a delivery ticket is a receipt, so the count, the damage notes and the photos have to come before the pen.
-
Construction Site Meeting Minutes Are Only the Action List
Site meeting notes that record discussion keep producing the same open issue every week, and a one-owner, one-date format stops it.